Asphaltic Pavent Insid Cppchina Camp In Majnoon Oilfield
This project involves the supply and construction of asphaltic pavement for the interior roads and
yards inside the CPP China camp in Majnoon. The paving works include a wearing course of 5cm on
a binder course of 5 cm. The base and sub-base courses are of selective granular lling materials
compacted to the required density according to AASHTO specications. The pavement covers a total
area of 2837.69 sq. m.
- We undertook the supply of materials for the CPP5-China project in the West Qurna Oil Field, which included reinforcing steel and concrete formwork wood.
- Supplying CPPS in West Qurna with various types of ready-mixed concrete.
- Supplying CPP China with 35,000 tons of drinking water within a 24-hour period for gas pipeline testing in West Qurna, under direct supervision from LUKOIL RUSSIA.
- Provided 2,000 concrete mass blocks to Oil Fields 12 and 13 in West Qurna for CPP and LUKOIL.
- Provided 50,000 cubic meters (cu. m) of sand and sub-base granular materials to the West Qurna Oil Field for CPP.
- Renovation of the 60 km service road connecting the strategic pipeline in Faw with Basra Channel in Khor Al Zubair, including replacement of damaged sub-base course according to AASHTO specifications.
- Produced 200 protection concrete T-walls for LUKOIL in West Qurna, including transportation to the required locations.
*All the above works have been done in a joint venture with QIMAT AL-EQTEDAR CO.