Asphaltic Pavent Insid Cppchina Camp In Majnoon Oilfield

This project involves the supply and construction of asphaltic pavement for the interior roads and yards inside the CPP China camp in Majnoon. The paving works include a wearing course of 5cm on a binder course of 5 cm. The base and sub-base courses are of selective granular lling materials compacted to the required density according to AASHTO specications. The pavement covers a total area of 2837.69 sq. m.
*All the above works have been done in a joint venture with QIMAT AL-EQTEDAR CO.